About the project

  • Date: April 30, 2026
  • Client: Mulungushi University
  • Category:
  • Address: Kabwe Town along Great North Rd, Kabwe, Central Province, Zambia
SmartEnergy successfully installed a cumulative total of 215kWp hybrid solar power systems for Mulungushi University, integrated with a combined battery energy storage capacity of 266kWh. The installations were designed to provide reliable, clean, and sustainable energy to the university’s Multipurpose Hall, New Lecture Theatre, and ICT Building. The hybrid solar systems seamlessly integrate solar generation, battery storage, and grid supply to enhance power reliability, reduce electricity costs, and support the institution’s transition towards sustainable energy solutions

Benefits of Project

The hybrid solar power installations at Mulungushi University provide reliable and sustainable energy solutions that support the institution’s academic and operational activities.

Technologies Used

The project incorporates advanced solar and energy storage technologies designed for efficient and intelligent energy management.

  • High-efficiency hybrid inverter systems integrated with lithium battery energy storage for reliable hybrid power operation.
  • Premium monocrystalline solar PV modules installed to maximize solar energy generation and system performance.
  • Smart remote monitoring and control platform enabling real-time system monitoring, performance tracking, and operational management.